THE MARINA PROJECT IN
TURGUTREIS-BODRUM HAS THE CAPACITY OF 400 YACHTS HAS BEEN MADE BY THE MODEL OF
BUILT-OPERATE-TRANSFER. THE SITE HAS BEEN ASSIGNED BY THE MINISTRY OF TOURISM.
IT IS IN THE CENTRE
OF TOWN. SO IN DESIGN, IT WAS TRIED TO HAVE SOME AXIS BETWEEN THE EXISTING SETTLEMENT,
SQUARES, ROADS AND THE NEW PROJECT. AND ALSO TO GET LARGE OPEN SPACES IN THE DIRECTION OF
SEA, THE BUILDINGS HAVE BEEN CONCENTRATED IN SOME AREAS.
THERE ARE 4 MAIN AREAS WHICH COMMERCIAL,
SOCIAL, TECHNICAL AND CUSTOM AREAS IN THE PROJECT.
THE COMMERCIAL AREA OPEN TO PUBLIC USE IS
LOCATED IN THE NEAREST POINT TO THE TOWN AND AROUND AN ARTIFICIAL LAKE THAT HAS BEEN MADE
OUTSIDE OF THE PORT. SO THE SEPERATION HAS BEEN
ACHIEVED NATURALLY AND ALSO IT ENABLES PEOPLE TO REACH THE WATERSIDE. SHOPS, GASTRONOMIC
UNITS (CAFES, PUBS, RESTAURANTS) HAVE BEEN UNITED WITH AN ARCADE AND SO A SHADY ALLEY HAS
BEEN CREATED.
IN THE SOCIAL AREA THAT SERVES TO
YACHTSMEN, THERE ARE MAIN SOCIAL BUILDING, ADMINSTRATION BUILDING AND SOME SPORT AREAS.
TECHNICAL AREA HAS A MAINTENANCE AREA,
SOME WORKSHOPS AND STAFF BUILDING.
THE CUSTOM BUILDING IS ON THE SECONDARY
BREAKWATER. THERE IS ALSO A FERRY QUAY ON THIS BREAKWATER.
THE SITE IS COMPLETED IN 16th Agu
2003. |